Every megawatt has a price tag.
Refresh Nigeria's model puts the full bill at $20–35 billion — and $30–40 billion if it must be done in four years.
⚠ Estimate — ranges from the Refresh Nigeria dossier at ₦1,360 per US dollar. Not official figures.
- Gas supply debts & pipelines$2.5–4bn
- Repair & expand power plants$6–10bn
- Transmission grid (TCN)$5–8bn
- Distribution networks$4–7bn
- Metering every customer$2–3.5bn
- Solar & mini-grids$2–4bn
Total: $20–35bn · 4-year rush: $30–40bn
Estimate · Refresh Nigeria — Power Truth dossier (financial model)
Who pays? Open the Tariff Cockpit (Band A–E) →Can 1 kWh cost ₦100?
Six changes that take the true cost from ₦210 to ₦103
Ordering a lower price doesn't make power cheaper; it only creates subsidy debt. Real cuts come from changing what it costs to make and deliver each kWh.
⚠ Hypothetical — Hypothetical reform scenario built with this app's teaching model. Each step's saving is applied in order, so the size of later savings depends on earlier ones. Not a NERC forecast.
1. Cut network losses
−₦38
ATC&C 30% → 12%, grid loss 8% → 5%
100% prepaid meters, aerial bundled cables, feeder metering, MDA bills deducted at source.
₦210 → ₦172 per kWh
2. Stabilise the power-sector exchange rate
−₦24
₦1,450 → ₦1,150 per $
Ring-fenced power FX window, or naira-priced gas and capacity contracts.
₦172 → ₦148 per kWh
3. Burn less gas per kWh
−₦23
Heat rate 10.5 → 8.0 MMBtu/MWh; plant cost $0.035 → $0.025/kWh
Convert open-cycle turbines to combined cycle; replace worn units. Refinance plant debt over longer terms.
₦148 → ₦125 per kWh
4. Use more hydro
−₦1
Hydro share 25% → 35%
Fully dispatch Zungeru, Kainji, Jebba and Shiroro, especially in the rainy season.
₦125 → ₦124 per kWh
5. Spread DisCo costs over more power
−₦15
DisCo cost ₦40 → ₦25 per kWh
Double the power flowing through the grid so fixed costs are shared by more kWh.
₦124 → ₦109 per kWh
6. Cheaper, naira-priced gas
−₦6
Delivered gas $3.22 → $2.40 per MMBtu
Flare-gas capture, lower pipeline tariffs, long-term naira gas-to-power contracts.
₦109 → ₦103 per kWh
Today
₦210
All six done
₦103
Show details +Hide details −
- Baseline: $20–35bn (about ₦27–48 trillion). Compressed four-year delivery: $30–40bn.
- Biggest items: power plants ($6–10bn), the transmission grid ($5–8bn) and distribution ($4–7bn).
- Likely funding mix: private power producers, development lenders, Eurobonds and cost-reflective tariffs — not the budget alone.
- Cheaper route (our estimate): restore idle gas plants, cut losses, and let states, companies and solar producers build near cities — about 6,000 MW for roughly $7–11bn, much of it private money. Compare both in Test the Plan.
- Cheaper power (hypothetical): cutting losses, steadying the exchange rate, more efficient plants, more hydro, spreading DisCo costs and cheaper gas could bring the true cost of 1 kWh from about ₦210 to about ₦100.
Tip: use ← → keys to move between chapters.